Frequently Asked Questions

Material Handling & Automation FAQs

Straight answers about conveyor systems, packaging equipment, controls integration, project timelines, and working with a turnkey material handling systems integrator.

Lone Star Automated Systems · Houston, Texas · Serving the Gulf Coast, all of Texas, and national & international projects since 1992.

Working With Lone Star

What does Lone Star Automated Systems do?

Lone Star Automated Systems is a turnkey material handling systems integrator headquartered in Houston, Texas, founded in 1992. We design, supply, install, and support conveyor systems, packaging equipment, and the electrical controls that unite them into one smoothly functioning production or distribution system.

What is a material handling systems integrator?

A material handling systems integrator coordinates the conveyors, machinery, controls, and trades on a project so the customer holds one company accountable for a working system — instead of a dozen vendors pointing at each other. As an integrator, we select the right equipment for your application rather than forcing it to fit a single manufacturer's product line.

What does "turnkey" mean on a material handling project?

Turnkey means Lone Star handles the entire project — consultation, design and project management, engineering, equipment supply, integration, installation, commissioning, and field support after startup. You get a single point of accountability from concept to punchlist zero, which minimizes downtime and vendor coordination risk.

What industries do you serve?

We serve food & beverage, manufacturing, pharmaceutical, petrochemical, and warehouse & distribution operations — handling cases, totes, bottles, bags, drums, pallets, and virtually any manufactured or processed goods. See our Industries Served page for details.

Do you build new production lines or upgrade existing ones?

Both. We design and equip entirely new production lines, and we retrofit or modify existing lines to increase throughput, speed, or flexibility. We also perform layout and line-balancing studies and modifications that maximize the use of the space and equipment you already own.

How does your project process work?

Our 15-step process runs from initial listening and data gathering through concept layout, engineering, quotation, equipment procurement, fabrication, installation, controls commissioning, operator training, and final punchlist closeout. You see a clear timeline before steel is ever ordered.

How long does a typical material handling project take?

Timelines depend on scope: a single conveyor addition may take weeks, while a full packaging line or distribution system typically runs several months from design through commissioning, driven largely by equipment lead times. After the initial consultation we provide a project schedule covering design, build, delivery, installation, and startup — so you know what to expect before committing.

How much does a material handling system cost?

Cost depends on the equipment mix, throughput rates, footprint, and controls complexity — a gravity conveyor run is a fundamentally different investment than an automated sortation or palletizing system. Because we're brand-agnostic, we engineer to your budget rather than to one manufacturer's catalog. Step one is a no-charge conversation: bring us your product, your rates, and your building, and we'll scope options with real numbers. Request a quote.

Do you provide support after installation?

Yes. We provide field assistance, operator training, technical support, and system modifications after startup. Because we designed and installed the system, our team supports the conveyors, packaging machinery, and controls as one integrated whole — not as separate vendor silos.

How do I get started?

Call 713-532-4444 or reach out through our contact page. Step one of our process is listening — there's no charge to start the conversation, and no obligation to move forward.

Conveyor Systems

What types of conveyor systems do you design and install?
How do I choose the right conveyor for my product?

The right conveyor depends on what you're moving (cases, bottles, pallets, drums, bags), your throughput rate, available floor and ceiling space, and environment (washdown, hazardous, ambient). That's the core of our design phase: we analyze your product and rates first, then match the technology — so the application drives the equipment choice, not the other way around. Compare conveyor types.

Do you install automated guided vehicles (AGVs)?

Yes. We integrate automated guided vehicles into material handling systems where flexible, driverless transport beats fixed conveyor paths — commonly for pallet moves between production, warehousing, and shipping in Texas manufacturing and distribution facilities.

Packaging Equipment

What packaging equipment do you provide?

We supply and integrate complete packaging lines: bottle unscramblers, fillers, case erectors, case packers, palletizers, depalletizers, shrink wrappers, and stretch wrappers — from unscrambler to stretch wrapper, connected by conveyor and unified controls.

Can you integrate new packaging machines into an existing line?

Yes. We regularly retrofit individual machines — a new case packer, palletizer, or wrapper — into existing lines, handling the conveyor connections, line balancing, and controls integration so the new equipment runs at rate with what's already on your floor, including installations performed during scheduled shutdowns.

Controls & Integration

Do you provide PLC programming and electrical controls?

Yes. Our controls and integration work covers PLC programming, control panel design and fabrication, and warehouse management (WMS) and transportation management (TMS) software integration — the layer that turns separate machines into one coordinated system.

Location & Service Area

Where is Lone Star Automated Systems located, and what areas do you serve?

We're headquartered at 2500 Citywest Blvd., STE 150, Houston, TX 77042. We serve manufacturers, distributors, bottlers, and processors throughout the Houston metro — including Pasadena, Baytown, The Woodlands, Sugar Land, Katy, and Beaumont — plus San Antonio, Austin, Dallas–Fort Worth, Corpus Christi, all of Texas, and national and international projects.

Can you install during a plant shutdown?

Yes. We plan and execute installations that fit your ongoing operation, including work that must take place during scheduled shutdown or turnaround windows — a common requirement for our food & beverage, petrochemical, and manufacturing customers along the Gulf Coast.

Have a Question We Didn't Answer?

Bring us your product, your rates, and your building — or just your problem. There's no charge to start the conversation.